The use process of hydraulic slope protection brick curing agent is very simple, and one application can control the entire curing cycle of the slope protection brick. The operation method can be sprayed or painted according to the appearance and construction conditions of the building, and the curing agent can be evenly applied to the surface of the slope protection brick. Construction projects are often completed by manual painting.
Agricultural spray or spray gun shall be used as spraying tools for hydraulic slope protection bricks. Before use, try spraying with clean water. After the atomization is normal, spray the curing agent. The distance between the spray gun and the surface of the slope protection brick is 20-50cm, slightly inclined. Adjust the pressure to 0.4~0.6 megapascals to avoid damaging the surface of the slope protection bricks.
To ensure even spraying, the spraying speed should be uniform. Generally combined from left to right and top to bottom to prevent leakage. If there is unevenness, spraying can be carried out within 5-10 minutes after a film formation to ensure the formation of a closed cured film on the surface of the slope brick. After the spraying operation is completed, wash the spray with clean water, and the blowout preventer is blocked, affecting the next use.
The brushing operation method is to directly coat the film with a paint brush or a dedicated paint roller. Generally, first apply horizontally, then apply within a certain range for 5-10 minutes, and then apply vertically again. Be sure to make the coating uniform, gradually expand the range from top to bottom, carefully brush the bottom corners or rough areas, and make the surface of the slope protection brick structure fully enclosed.
When spraying, attention should be paid to the absence of floating water or evaporated bleeding on the surface of the hydraulic slope protection bricks. When pressing the seamless edge of the slope protection brick with your fingers, you can spray the curing agent. After removing the template, immediately carry out spraying and maintenance operations. Spraying too early will corrode the surface of the slope protection bricks, and delaying too late will cause the moisture of the slope protection bricks to evaporate, affecting the maintenance effect.
The dosage index of the curing agent for spraying hydraulic slope protection bricks is 1kg, and the spraying area of the curing agent is controlled within 4-6m. The brushing area can be controlled within 5m3. When the weather is hot or windy, the dosage of the curing agent can be increased as appropriate. During operation, the amount and quality of materials should be promptly monitored.
When spraying and painting the maintenance agent for hydraulic slope protection bricks, it is necessary to prevent the overflow of rainwater and dust, and at the same time, pay attention to avoiding mechanical collisions or driving and dragging heavy objects on it. If there is any damage, it should be promptly cleaned. After reading the above content, if you have any other questions about the product, please contact us. We look forward to working with you.